JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle Solaris 11.1 Administration: Oracle Solaris Zones, Oracle Solaris 10 Zones, and Resource Management     Oracle Solaris 11.1 Information Library
search filter icon
search icon

Document Information

Preface

Part I Oracle Solaris Resource Management

1.  Introduction to Resource Management

Resource Management Overview

Resource Classifications

Resource Management Control Mechanisms

Constraint Mechanisms

Scheduling Mechanisms

Partitioning Mechanisms

Resource Management Configuration

Interaction With Non-Global Zones

When to Use Resource Management

Server Consolidation

Supporting a Large or Varied User Population

Setting Up Resource Management (Task Map)

2.  Projects and Tasks (Overview)

3.  Administering Projects and Tasks

4.  Extended Accounting (Overview)

5.  Administering Extended Accounting (Tasks)

6.  Resource Controls (Overview)

7.  Administering Resource Controls (Tasks)

8.  Fair Share Scheduler (Overview)

9.  Administering the Fair Share Scheduler (Tasks)

10.  Physical Memory Control Using the Resource Capping Daemon (Overview)

11.  Administering the Resource Capping Daemon (Tasks)

12.  Resource Pools (Overview)

13.  Creating and Administering Resource Pools (Tasks)

14.  Resource Management Configuration Example

Part II Oracle Solaris Zones

15.  Introduction to Oracle Solaris Zones

16.  Non-Global Zone Configuration (Overview)

17.  Planning and Configuring Non-Global Zones (Tasks)

18.  About Installing, Shutting Down, Halting, Uninstalling, and Cloning Non-Global Zones (Overview)

19.  Installing, Booting, Shutting Down, Halting, Uninstalling, and Cloning Non-Global Zones (Tasks)

20.  Non-Global Zone Login (Overview)

21.  Logging In to Non-Global Zones (Tasks)

22.  About Zone Migrations and the zonep2vchk Tool

23.  Migrating Oracle Solaris Systems and Migrating Non-Global Zones (Tasks)

24.  About Automatic Installation and Packages on an Oracle Solaris 11.1 System With Zones Installed

25.  Oracle Solaris Zones Administration (Overview)

26.  Administering Oracle Solaris Zones (Tasks)

27.  Configuring and Administering Immutable Zones

28.  Troubleshooting Miscellaneous Oracle Solaris Zones Problems

Part III Oracle Solaris 10 Zones

29.  Introduction to Oracle Solaris 10 Zones

30.  Assessing an Oracle Solaris 10 System and Creating an Archive

31.  (Optional) Migrating an Oracle Solaris 10 native Non-Global Zone Into an Oracle Solaris 10 Zone

32.  Configuring the solaris10 Branded Zone

33.  Installing the solaris10 Branded Zone

34.  Booting a Zone, Logging in, and Zone Migration

Glossary

Index

When to Use Resource Management

Use resource management to ensure that your applications have the required response times.

Resource management can also increase resource utilization. By categorizing and prioritizing usage, you can effectively use reserve capacity during off-peak periods, often eliminating the need for additional processing power. You can also ensure that resources are not wasted because of load variability.

Server Consolidation

Resource management is ideal for environments that consolidate a number of applications on a single server.

The cost and complexity of managing numerous machines encourages the consolidation of several applications on larger, more scalable servers. Instead of running each workload on a separate system, with full access to that system's resources, you can use resource management software to segregate workloads within the system. Resource management enables you to lower overall total cost of ownership by running and controlling several dissimilar applications on a single Oracle Solaris system.

If you are providing Internet and application services, you can use resource management to do the following:

Supporting a Large or Varied User Population

Use resource management features in any system that has a large, diverse user base, such as an educational institution. If you have a mix of workloads, the software can be configured to give priority to specific projects.

For example, in large brokerage firms, traders intermittently require fast access to execute a query or to perform a calculation. Other system users, however, have more consistent workloads. If you allocate a proportionately larger amount of processing power to the traders' projects, the traders have the responsiveness that they need.

Resource management is also ideal for supporting thin-client systems. These platforms provide stateless consoles with frame buffers and input devices, such as smart cards. The actual computation is done on a shared server, resulting in a timesharing type of environment. Use resource management features to isolate the users on the server. Then, a user who generates excess load does not monopolize hardware resources and significantly impact others who use the system.